Visual Confirmation of Voice Takeoff Clearance (VICON) Operation Evaluation Volume II
This document is Volume II of the Visual Confirmation of Voice Takeoff Clearance (VICON) Operational Evaluation. It contains working drawings and schematic diagrams, technical details, and maintenance and detailed operational procedures for the VICON system that was installed at Bradley International Airport, Windsor Locks, Connecticut. The drawings, instructions, and charts in this volume are reproduced exactly as they were used by the Bradley maintenance and ir traffic control specialists; no effort was made to formalize or improve the appearance of this information. This volume, therefore, would be utilized if one is interested in considering future implementation or design modification of the VICON system. Seven appendices were added in order to consolidate under one cover the various operational, maintenance, and design details for the VICON system and its components.
FAA-RD-80-114-II
Authors: John J. Maurer, B. Castle, A.K. Novakoff, R. Nelson, S. Roditi, F.P. Zito