Construction Cycle 7 (CC7) Documents

 

CC7 Construction Report:

  1. CC7 Construction History Report
  2. Appendix A - CC7 Construction Plan
  3. Appendix A - CC7 Instrumentation Plan
  4. Appendix A - CC7 Painting Plan
  5. Appendix B - CC7 As-Built
  6. Appendix C - CC7 Material Testing
  7. Appendix D - CC7 DuPont Subgrade Material Testing
  8. Appendix E - CC7 P154 Subbase Characterization Testing
  9. Appendix F - CC7 P209 Aggregate Base Course Characterization Testing
  10. Appendix G - CC7 Asphalt Treated Drainable Base Job Mix Formula
  11. Appendix H - CC7 P401 Hot Mix Asphalt

CC7 Perpetual/Overload Pavement Test Plan:

  1. CC7 Test Plan
  2. Attachment1 - Response Tests-Plan-CC7
  3. Attachment2 - Response Tests-Plan-FOSP-CC7

CC7 Perpetual Pavement Comprehensive Traffic Test (North):

  1. CC7 Perpetual Pavement Traffic Test
  2. Appendix A - CC7 As-Built Drawings
  3. Appendix B - MDD Preliminary Analysis
  4. Appendix C - ASG Preliminary Analysis
  5. Appendix D - PC Preliminary Analysis
  6. Appendix E - MDD Full-Set Analysis
  7. Appendix F - PC Full-Set Analysis
  8. Appendix G - Full-Set ASG Analysis
  9. Appendix H - Distress Map Written Log
  10. Appendix I - Crack Quantization and PCI Data
  11. Appendix J - Resilient Modulus Test Results - Analysis

CC7 Overload Pavement Comprehensive Traffic Test (South): 

  1. CC7 Overload Pavement Traffic Test
  2. Appendix A - CC7 As-Built Drawings
  3. Appendix B - MDD Preliminary Analysis
  4. Appendix C - ASG Preliminary Analysis
  5. Appendix D - PC Preliminary Analysis
  6. Appendix E - Full-Set ASG Analysis
  7. Appendix F - PC Full-Set Analysis
  8. Appendix G - MDD Full-Set Analysis
  9. Appendix H - HWD Deflection Analysis
  10. Appendix I - Distress Map Written Log
  11. Appendix J - Crack Quantization and PCI Data
  12. Appendix K - Resilient Modulus Test Results - Analysis

CC7 Comprehensive Post Traffic Test (North and South)

  1. CC7 Comprehensive Post Traffic Report - Field Testing
  2. CC7 Comprehensive Post Traffic Report - Lab Material Characterization


Return to Construction Cycle 7 Overview